Shift Log
The Shift Log brings together a Department's handover notes, people, Action Items and maintenance Events. Select Shift Log in the side menu; the management page is headed Shift Logs. Where enabled and permitted, the Events screen also provides Open Shift Log.
The workflow
- Enable the Department and check its timezone and optional report-email setup.
- Start a log or resume the open log. The normal start workflow checks for an existing open log for the same Department.
- Check the report period, notes and people, then review Action Items and Events and comments.
- Save your work during the shift. Save stores the log and closes its form; it leaves the shift in progress.
- Finalise and share the handover when it is ready. Finalisation creates the report and makes the log read-only in this workflow.
- Use View Shift Logs to find an in-progress log or the saved PDF for a completed handover.
Inside the log
| Tab | Use it for |
|---|---|
| Dashboard | Summary cards and tables for priority/overdue Action Items, ownership, categories and available operational information. Check the supporting lists before acting on a summary. |
| General | Required Supervisor Name, Department, Shift Name and Report Start/End dates and times; shift notes and the configurable secondary notes section, normally Safety Notes. |
| People | Crew members and the names of Contractors involved in the shift. |
| Action Items | Shared Department follow-ups, with optional Asset, Category, Priority, Owner, dates and Warranty flag. |
| Events | In Progress, Recently Completed and Upcoming Events for the Department and accessible descendants. |
| Comments | Comments and available photos from the in-progress/recently completed Events, with expand/collapse controls. |
| Documents | Supporting files attached to the log. |
Report periods use the Department's timezone and the configured shift defaults; they are not a fixed twelve-hour period. Day Shift and Night Shift are the current Shift Name choices. Confirm the actual dates, times and name for each handover.
Action Items belong to the Department and persist across shifts. Event edits affect the actual Events. These records are separate from the log's notes and from the PDF produced at finalisation. Opening a help link or printing a draft does not finalise the shift.