Add Meter Reading

Open Meter Readings in Samurai

The Meter must already be assigned to the Asset. If it is missing, open Assets, edit the Asset, and add it on the Meters tab first.

From an Asset

  1. Open Assets and edit the Asset.
  2. Open Meter Readings.
  3. Select Add Meter Reading.
  4. Confirm the Meter, enter the reading's date and time, and enter the reading value.
  5. Select Save.

From the Meter Readings screen

  1. Open Meter Readings from Readings & Meters → Meter Readings.
  2. Select Add Meter Reading.
  3. Search for and select the Asset using its Asset Number or Description.
  4. Select one of its assigned Meters.
  5. Confirm the date and time, enter the reading, and select Save.

Validation and dates

The entry screens use the Asset's Department time zone. Check the displayed date and time rather than assuming your browser's time zone applies.

A reading must be numeric, must not be in the future, and must not predate the Asset's System Start Date. The configured Meter rules determine limits, permitted negative values, and allowed increases over time. Readings are checked against surrounding valid readings and the Start Reading. For an hours meter configured for a maximum increase of 24 hours per day, the permitted increase is scaled to the actual elapsed time; this is not a universal rule for every Meter.

Resolve the displayed validation errors before saving. Use Meter definitions to review the applicable rules. Invalid readings are excluded from normal valid-reading results.