Import Meter Readings

Open Data Loading in Samurai

Use the Meter Readings importer to load an Excel or CSV file. You need access to the data-loading screen and the relevant Meter Readings permissions.

Prepare and import a file

  1. Open Data Loading and choose Meter Readings.
  2. Select Download Template and prepare the file using its column headers.
  3. Ensure the Assets exist and the selected Meters are assigned to them. Use Assets to check meter assignments.
  4. Load the file, review the imported rows and lookup matches, and correct errors before committing.
  5. After import, open Meter Readings to verify that the expected readings were saved.

Import columns

Column Value
assetId The Asset Number used by the import lookup to find the Asset. Required.
metersId The Meter name used by the lookup. The import screen marks this optional, but the save operation needs a Meter assigned to the Asset; supply it explicitly.
readingDate Reading date and time. Required; check the parsed value in the importer.
value Numeric reading value. Required.

Validation and results

The file importer sends readings individually through the Meter Readings save operation. The server validates the Asset/Meter association, date, and Meter rules. Do not rely on the importer's older on-screen note saying there is no meter validation.

Import is not an all-or-nothing batch: a failed row does not roll back readings already saved, and the importer continues with later rows. Completion progress alone does not confirm that every reading was saved. Verify the results in Meter Readings, particularly after importing historical data.

Integration imports

Telematics and other configured sources are managed separately in Integrations and File Integrations. They depend on an enabled connection, matching Assets and Meters, and the source's configuration. Uploading a spreadsheet does not configure an integration.

Valid imported readings can affect usage-based forecasts. Importing readings does not itself guarantee that a Task will immediately generate a Work Order; scheduling still depends on the Task's settings and the normal planning process.