Add a Shift Log

Open Shift Logs in Samurai. You need permission to create a log; updating an existing one also requires the applicable update permission.

Start or resume

  1. Select Start Shift Log. In the Shift Logs window, review the open logs and select the relevant row to resume one.
  2. To begin another Department's log, select Start New Shift Log.
  3. Select the Department, then select Start New Shift Log again. Only enabled, accessible Departments are offered.
  4. If the message Shift Log already open for this department appears, resume that existing log and finalise it when appropriate. The normal start workflow checks again before opening another log for the same Department.
  5. The form opens on Dashboard and attempts to save the initial log automatically. Check that creation succeeds; this initial save does not mean all later edits are continuously autosaved.

The Department is fixed in the open form. If an incorrect Department has already produced a saved log, use the authorised Delete a Shift Log process for that incorrect record; do not assume closing the window removes it.

Check General

  1. Open General and confirm the required Supervisor Name, Shift Name, Report Start Date/Time, and Report End Date/Time. The current Shift Names are Day Shift and Night Shift.
  2. Check the Department timezone and the actual report period, including shifts crossing midnight. The initial period comes from the configured shift start and duration, rather than a fixed twelve hours.
  3. When you adjust Report Start, Samurai can adjust Report End from the default duration until you have manually changed the end. Confirm both ends again after editing.
  4. Enter your shift notes and the secondary handover notes. The secondary label normally reads Safety Notes, but your organisation can configure a different label.

Record People and Documents

On People, select Crew members and use Add to include them. Where offered, + Add New Crew Member opens the creation workflow. Enter each Contractor name and select Add. Use the row's remove control to correct an entry.

On Documents, upload the supporting files and review the file list. Save the log to retain its attachment references along with the other report details.

Review and save

  1. Check the Action Items, Events and Comments tabs.
  2. Select Save at the bottom. This saves the log and closes the form, leaving it In Progress.
  3. Reopen the log to continue or to check that changes were retained. Save before closing rather than relying on every close control to warn about unsaved changes.

If an Unsaved Changes prompt appears, Yes saves and closes; No discards the unsaved log-form changes. Separately saved Action Item or Event changes are not undone.

When the handover is ready, follow Finalise and Share a Shift Log. Save and Print Shift Log do not finalise it.