Asset Assignment

Open Asset Assignment in Samurai

An Asset assignment connects an actual Asset to a Project, the applicable Plant Rate, and its hire dates. These source records determine which Customer/Project receives the hire charge and which part of the billing cycle is chargeable.

Add or edit an assignment

  1. Open Asset Assignment from Plant Management.
  2. Find the existing assignment and open its editor, or select Add Assignment.
  3. Select the required Asset and Project.
  4. Select its Plant Rate. Options match the Asset's Model/Group and identify their source as Project Rate or Book Rate. Review the displayed price. If the selector shows No Plant Rate Available, correct the Project/rate setup first.
  5. Enter Start and End. Confirm Status, Hire Status, and relevant Notes.
  6. Select Save. Review any confirmation about updating the Asset's current hire information before accepting it.

The editor requires valid dates and checks overlapping active assignments. The selected Status and Hire Status are separate controls; confirm both reflect the actual hire.

Rates and transfers

Check the assignment against the accepted agreement and the Plant Rate Book or Project rate. Use distinct dated assignments when changing the Project or agreed rate during a hire. Editing one rate's price does not create the history needed to reconstruct separate earlier and later prices.

Avoid overlapping charge windows. For a supported same-date handover, the handover day is billed to the incoming assignment; the outgoing charge window ends the previous day. See Billing Periods and Calculation.

On hire and off hire

Keep the Asset's hire flag, Hire Status, assignment Status, Project and dates consistent with the actual operation. Review the Asset directly through Assets where needed.

When changing Hire Status to off hire, the application can ask you to confirm an end date for active assignments. Read that confirmation carefully: it can complete active assignments for the Asset, rather than merely change the switch's appearance.

Record an actual reading and timestamp when the Asset goes on hire and off hire using Meter Readings. The Review Invoices and Readings guide explains the billing targets and continuity rules.

Resolve missing assignments before billing

In Plant Rate Invoicing, expand On-hire assets without an assignment and correct the listed records. Do not exclude an Asset solely to hide unresolved hire data.

After changing a source assignment for a period with saved drafts, return to invoicing, select Recalculate, and review the revised hire window, readings, rate and amount. A saved quote alone does not replace this assignment check.