Finalise and Share a Shift Log

Open Shift Logs in Samurai, select In Progress and open the relevant Department log. Review the handover before finalising; the completed form is read-only in the normal workflow.

Review the handover

  1. Confirm Supervisor, Department, Shift Name and the report start/end in the correct Department timezone.
  2. Check notes, People, Action Items, Events and comments, and Documents. Refresh the context by saving and reopening if source records have changed elsewhere.
  3. Check the actual Event dates. Upcoming is a Planned Event list, rather than a guarantee that every listed Event starts in the next shift.
  4. If you want a preview, select Save, reopen the log and select Print Shift Log. It requires a saved log and downloads a PDF; it does not finalise the shift or send the finalisation email.

Printing reads the saved log details, with the Event data supplied for that report. Unsaved changes to notes, People or Documents are not a substitute for Save. Category/table filters and the currently selected Event tab are view choices; they do not restrict the report to just the rows currently visible on screen. Action Items are selected for the Department and grouped for the report.

Finalise

  1. Choose Finalise and Close to complete the current log and return to the list, or Finalise and Start New to complete it and prepare another log for the Department.
  2. In Finalise Shift Report, read the message that the closed report cannot be edited, then select OK to proceed or Cancel to continue editing.
  3. Wait for the result. Successful finalisation saves the completed log and generates/uploads its PDF. If Department report email is configured, Samurai also attempts that email delivery.
  4. Open Completed and check the record and its Report PDF link. Verify the report before using it for handover.

Finalise and Start New prepares the new report period from the current defaults and starts a new editable log. Confirm its Supervisor, dates, Shift Name, Crew and Contractors; do not assume the previous shift's People or notes were carried forward. Shared Department Action Items remain separate follow-ups.

Share and check delivery

The completed list's PDF icon opens the stored report. Use that file/link through your organisation's normal handover process.

Automatic email requires Email Shift Log Report and an Email Group on the Department, valid group recipient addresses, and the working email service. It sends a link to the generated PDF; the Crew list is not the email distribution list. Ordinary Save and draft printing do not trigger this finalisation email. See Enabling Departments for Shift Log for setup.

A completed record or PDF alone does not prove that every recipient received email. If finalisation reports an error or the PDF/email is missing, check the Completed list before repeating the action or starting another log, then ask your administrator to investigate the report or email result. Report generation/delivery can fail after the log's completed state has been saved, and the form has no manual resend control.