Billing Periods and Calculation

Open Plant Hire Invoicing in Samurai

Choose the billing start month

Set Billing start year and Billing start month. The page initially selects the previous calendar month. The selected month identifies the month in which each Customer's cycle starts, rather than a common date range for every invoice.

Both displayed invoice dates are inclusive. If the configured start day does not exist in a month, Samurai uses that month's final day. The following month's start is calculated independently from the original setting.

Customer start day Selected start month Inclusive Customer period
1 September 2026 1–30 September 2026
10 September 2026 10 September–9 October 2026
31 February 2026 28 February–30 March 2026

The Asset's charge window

The hire window is the overlap between the Customer period and the dated Asset assignment:

  • Start is the later of assignment start and Customer period start.
  • End is the earlier of assignment end and Customer period end.
  • An open-ended assignment continues to the period end. An assignment with no overlap has no charge window in that period.

For a Customer period of 1–30 September and an assignment of 11 September–5 October, the September charge window is 11–30 September, or 20 inclusive calendar days. The assignment editor may require an End date for new records even where older records are open-ended.

Calculate a new run

  1. Open Plant Hire Invoicing.
  2. Choose the correct billing start year and month.
  3. Complete the preparation checks.
  4. If no run exists, select Calculate Invoices and confirm the selected month.
  5. Review the draft invoice groups, warnings, totals, and On-hire assets without an assignment panel.

Calculation saves the rates, readings and pricing inputs used for the draft. Opening the page later does not automatically rebuild those saved values. If a run already exists, use Recalculate to refresh eligible drafts rather than trying to create another run for the same month. Committed or sent invoice scopes are retained.

Changing a Customer's cycle

Change the Customer's Billing start day in Plant Management reference tables, then return to Invoicing. Saved draft dates stay unchanged until you explicitly recalculate.

Recalculate previews the old and proposed inclusive dates. Clear period-sensitive overrides before moving a draft to a changed cycle. Overlaps with already billed dates, or gaps within the same hire, can block the change. Resolve the missing ordinary period or arrange an approved transition process; Samurai does not invent a transition invoice automatically.

Continue with Review invoices and readings.