Checklist and Troubleshooting
Open Plant Hire Invoicing in Samurai
Before calculating
- [ ] Correct billing start month/year and Customer billing start days.
- [ ] Customer details, payment terms, Project Customer/Department, and timezones checked.
- [ ] Dated Asset assignments and agreed rates confirmed.
- [ ] Required meters, actual readings and completed breakdown Events up to date.
- [ ] Appropriate access and revenue accounts available.
See Before you start and Rates, quotes and assignments.
Before committing
- [ ] Review all invoice groups, including groups hidden by filters.
- [ ] Resolve on-hire Assets without an assignment.
- [ ] Confirm each inclusion/exclusion and arrange follow-up for omitted charges.
- [ ] Check hire windows, readings, timing acceptance and prior-period continuity.
- [ ] Check minimum proration, downtime, monthly fees and override reasons.
- [ ] Resolve actionable warnings on included charges and complete necessary recalculation.
- [ ] Recheck Invoice Details, accounts, adjustments, PDF and saved totals.
- [ ] Read the whole-run commit confirmation and inspect resulting statuses.
Before and after sending
- [ ] Check the Xero organisation, Customer contact mappings and revenue accounts.
- [ ] Review the complete eligible-send preview for the selected month/year.
- [ ] Resolve validation errors; inspect Sent, Failed and Skipped results separately.
- [ ] Verify successful invoices in Xero and reconcile uncertain attempts.
- [ ] Arrange final invoice delivery through the agreed accounts process.
Common warnings and questions
| Message or question | Next action |
|---|---|
| No Rate Applied | Check the assignment's rate. Correct it in Asset Assignment and recalculate, or record an approved invoice-specific pricing override. An intentional explicit zero rate is valid. |
| Missing Customer or Project | Correct the allocation in Plant Management reference tables and the assignment. A money override does not repair an allocation. |
| Missing primary meter / missing start or end reading | Check the Asset's assigned meter and Meter Readings, then refresh/recalculate. Use an approved complete invoice override only where appropriate. |
| Check start reading / Check end reading | Compare the actual reading time with its target. Correct it, apply a justified invoice override, or explicitly accept the selected reading where offered. |
| End meter reading is before start | Investigate a wrong reading, wrong meter, replacement or reset; correct the source or approved inputs. |
| Invalid carried reading / preceding closing changed | Resolve the preceding invoice/reading and refresh the current row. Do not silently replace the continuity boundary. |
| Missing External Account | Select a valid revenue account and correct Xero setup before sending. Commit alone does not prove Xero readiness. |
| Manual override applied | Check the reason and result. This information notice alone does not block commit. |
| Invoice exceeds actual usage × rate | Review minimum hours, partial-cycle proration, separate fees, monetary floors and retained overrides. |
| Downtime did not reduce actual usage | Less Downtime reduces the minimum-hours floor; actual usage above it remains billable. |
| Small/zero Subtotal override did not reduce the total | Review the effective minimum. Minimum Charge zero alone does not remove an hours floor. |
| Rates need recalculation / red indicator | Recalculate drafts from changed source data, then recheck overrides and totals. |
| No matching invoice rows | Clear review filters and check the unassigned-assets panel. |
| Only some invoices committed | Clean invoices committed; unresolved invoices remain Draft. Correct and commit those later. |
| Confirmation differs from summary cards | Cards use filtered rows. Commit and Xero sending operate across the selected run. |
| PDF shows Assets outside the Asset filter | The filter selects invoices offered; each selected invoice prints its complete included lines. |
| Changed Customer cycle is rejected | Check overlapping billed dates, gaps in the same hire and period-sensitive overrides. Resolve the transition before recalculating. |
| Nothing appears in the Xero preview | Check month/year, commit status, exclusions and whether the invoices were already sent. |
For detailed procedures, see Review invoices and readings, Overrides and recalculation, and Print and send invoices.
Worked training example
With a full-month $150/hour hire and a 200-hour minimum, readings of 2,539 and 2,768.5 give 229.5 hours. The usage charge is $34,425 before GST, above the $30,000 minimum, so there is no minimum uplift. Without other fees/adjustments, 10% GST is $3,442.50 and the total is $37,867.50.
Use sample exercises in a training environment. Review and commit only invoices you are authorised to issue.